Loading Socks Costing…

Workspace

Costing Groups

Raw materials

Edit Wastage

Adjust the in-house yarn wastage used in costing. Enter a whole number. 10 means 10%.

Packing Materials Waste

Set the packing wastage for this costing. Applies to all packing lines. Enter a whole number — 3 means 3%.

Operating Efficiency Override

Override the global operating efficiency for overhead calculation in this costing only. Enter a whole number — 80 means 80%. Leave at global default to use the configured rate.

Override active.

Link Costing to BS

Searching…
No results found

Order Details

Loading full P&L breakdown…

SR Link

Link Sample Request

Search by BS Code or SR Number — select a row to confirm the link.

Already linked to Costing # (). Open →

BS Code SR # Customer Article Description